Navigation
- 1: Home
- 2: Meetings
- 3: Events
- 4: Organization
- 4.1: Bylaws
- 4.2: Committees
- 4.2.1: Audit
- 4.2.2: Awards
- 4.2.3: Chairman
- 4.2.4: Historian
- 4.2.5: Constitution and Long Range Planning
- 4.2.6: Cleveland Technical Societies Council (CTSC)
- 4.2.7: Finance - Treasurer
- 4.2.8: Education
- 4.2.9: Hospitality
- 4.2.10: Membership
- 4.2.11: Nominating
- 4.2.12: Publications
- 4.2.13: Registration
- 4.2.14: Chapter Secretary
- 4.2.15: Social
- 4.2.16: Student Affairs Committee
- 4.3: Chapter History
- 4.4: Nominations
- 4.5: Officers & Committee Chairs
- 4.6: Sponsor & Volunteer
- 5: Education
- 6: Directory
- 7: Buyer's Guide
- 8: Sustaining Members
- 10: Jobs
- 11: Contact
First Energy Eastlake Plant
10 Erie Road
Eastlake, Ohio 44095
Participants should plan to arrive between 4:00pm - 4:15pm as the guard may have the vehicles checked. An escort will meet people at the main lobby (second guard check-in) and escort people to the assembly room. The attire should be long sleeves shirts and pants with work boots or hard soled shoes. No tennis or open toed shoes allowed. Coats may be needed on the tour due to cold areas in the plant. Safety glasses and hard hats will be provided.
Down load instructions/directions: Feb10 Plant Tour Instructions
Registration is now closed.
You must be on the attendance list to be allowed in the plant. For late registration information, email Jeff Blough at JBlough@FirstEnergyCorp.com
Attending the Meeting
| Marty Shingler | Lakeland Community College | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Fred Lisy | Orbital Research Inc | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Devin Wachowiak | Rolled Alloys | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Alan Vormelker | Babcock & Wilcox, NOG-Euclid | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Brian Share | Preformed Line Products | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Rick Miller | Akron Steel Treating Co. | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Bil Gilbert | PHECo | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| David Strecker | Rockwell Automation | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| John Kuli | Brush Wellman | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Rick Sammon | Stork Herron Testing Laboratories |
Monday, February 8th, 2010
Plant Tour
Technical Chair Jeff Blough
Arrive between 4:00 & 4:15pm
Optional group dinner following tour
Tour of First Energy’s Eastlake Plant
Join us for a tour of this landmark power plant capable of supplying 1200+ MWatts of electricity to the Cleveland Area. The plant has been in continuous operation since 1953 and currently employs 300 people.
Specific Environmental Measures of Interest:
- The plant burns very low-sulfur western and medium sulfur eastern coals.
- Generating units use electrostatic precipitators, which remove more than 99% of particulates from flue gas. The gases pass between fields of electrically grounded plates to which the electrically charged dust is attracted.
- Coal ash captured by precipitators is either sold for a variety of uses including the manufacture of concrete, structural fill, roofing shingles and ice-control material, or is placed in specially designed landfills. Five units are equipped with low nitrogen-oxide (NOx) burners which reduce NOxemissions by 30-40%. Two units use Selective Non-Catalytic Reduction (SNCR) technology to reduce NOxby an additional 25%.
